Nottingham · since 2016

Industrial parks that can prove their carbon.

We take a site from grid connection to operating park: the shared energy infrastructure, and the metering and reporting every tenant has to file.

We develop, we build, and we stay on as operator. Your tenants get a supply they can audit; you get a park that can answer a CSRD questionnaire.

Agent access

This profile is enrolled with Cape Partners. An assistant can read the agent card and call the MCP endpoint below — no account, no key.

Agent card
https://zeroemissionpark.uk/.well-known/agent-card.json
MCP endpoint
https://zeroemissionpark.uk/mcp (streamable HTTP)
Public profile
https://zeroemissionpark.uk/partner.json
Enrolment proof
https://zeroemissionpark.uk/.well-known/cape-enrollment.json

The door answers what we publish, routes a described site, and — if you ask it to contact us — records a request for a person to review. It claims no capacity, price or date, and every route ends at a scope agreed in writing.

What we do

Three lines, one sequence: the site, the energy, the numbers.

Zero-emission park development

Site selection, grid connection, permitting and build-out of shared energy infrastructure for industrial parks.

  • Grid capacity study and connection agreement before any ground is broken
  • Permitting strategy, environmental screening and community consultation
  • Masterplan for shared plant: substation, heat network, storage, site roads

On-site energy infrastructure

Build and operate the generation and storage a park runs on: solar, batteries, heat recovery, PPAs and the microgrid that ties them together.

  • Rooftop and ground-mount solar sized to the park load profile
  • Battery storage and heat recovery, with an operating model and an O&M contract
  • Power purchase agreements and microgrid control, islandable where the DNO allows

Tenant carbon compliance

Scope 1 and 2 accounting, CSRD-ready reporting and a per-tenant decarbonisation roadmap that survives an audit.

  • Metering and data model per tenant, reconciled to half-hourly supply data
  • Scope 1 and 2 baseline, with a documented method and an auditable trail
  • CSRD / SECR reporting pack and a costed decarbonisation roadmap per unit

How a park gets built

  1. Grid and siteA capacity study and a connection agreement before anything is committed. If the grid cannot take the load, we say so and stop.
  2. Consent and buildPermitting, environmental screening and the shared plant: substation, solar, storage, heat network, site roads.
  3. Operate and reportMicrogrid operation and O&M, half-hourly metering per tenant, and the reporting pack each tenant needs at year end.

Sectors

Load-heavy, grid-constrained, and under pressure to report.

  • Food processing
  • Logistics
  • Automotive suppliers
  • Chemicals
  • Data centres
  • Light manufacturing

Contact

Tell us about the site. We answer within two working days.

Trent Valley Zero
Unit 4, Trent Works, Nottingham NG1 1AA
hello@zeroemissionpark.co.uk

Tell us the site, the load and the deadline. We answer within two working days, and every enquiry is scoped in writing with a named development lead.